Project Details

Location: San Marcos, Texas
Owner: Texas Department of Transportation (TxDOT)
Contractor: Hunter Industries, Ltd. 

Products Used

Project Overview

The I-35 from Loop 82 to River Ridge Parkway project in San Marcos, Texas included several northbound improvements, including ramp relocations, new exit and entrance ramps, and reconstruction of the frontage road.

One portion of the work involved widening the roadway for a new northbound entrance ramp just south of River Ridge Parkway. The existing roadway embankment was elevated using a Reinforced Earth® wall, built years earlier. To avoid a full reconstruction of the embankment at the bridge, the project team chose to install a new MSE wall offset in front of the existing wall, which is a common solution for road widening projects used successfully for decades called Shored Reinforced Earth.

Extending the Existing Reinforced Earth® Wall

Over the 850-ft length of the new wall, the design secton had three major variations based on the wall height and offset:

  • Conventional MSE wall footprint.
  • MSE wall with a base width reduced to 0.5H and extended upper rows of soil reinforcements. The existing wall remained generally unmodified, other than removing some top panels to accommodate the new top row of soil reinforcements.
  • Shored Reinforced Earth wall with a base width reduced to 0.3H using a soil reinforcement “Sandwich Connection”, and extended upper rows. New soil reinforcements were installed in the front face of the existing wall with anchors. The soil reinforcements on the new wall facing overlapped.

Typical section showing Shored Reinforced Earth wall with sandwich connection

The solution required an evaluation of the existing wall to determine the remaining service life, and how much it would influence a reduced lateral earth pressure for the design of the new wall. The design required special considerations for every possible case of criteria along the wall, optimizing the design while also simplifying the installation over the entirety of the wall. Extensive detailing was involved to ensure that the appropriate facing units were cast and the existing structure was modifued properly in the field.

This approach allowed the roadway widening to move forward while maintaining traffic flow along the existing roadway, minimizing disruption to motorists.